Go directly to an item in the Community Development Library - Transportation:
- A Parking Study For Fort Wayne, Indiana (1/17/56)
- A Proposal To Consolidate Human Service Agency Transportation (9/29/97)
- Bike Fort Wayne Plan (1/1/2009)
- Bus Fort Wayne Plan (1/1/2013)
- Citilink Transit Development Plan Preliminary Study (2/23/2004)
- Downtown Improvement Traffic Study Project Evaluation Report (9/1/2004)
- Feasibility Study Anthony Boulevard Corridor (3/1/76)
- Feasibility Study East-West Highway Fort Wayne, Indiana (5/15/73)
- Feasibility Study Wells Street Corridor (3/1/74)
- Federal Highway Application Re: 469 Bypass (draft) (1/1/75)
- Final Report Feasibility Study For Calhoun Street Transit/Pedestrian Mall (draft) (1/1/82)
- Fort Wayne Mass Transportation Center Feasibility & Design Study (draft) (8/1/85)
- Fw Transit Needs Assessment Study & Service Provision Remedy Alternatives Final Report (10/13/97)
- Harrison Square Traffic Circulation Plan Final Report (10/9/2007)
- Illinois Road/Jefferson Boulevard Corridor Study (6/1/87)
- Illinois Road/Jefferson Boulevard Corridor Study (2/1/87)
- Illinois/Jefferson Corridor Transportation Study (7/1/87)
- Lakewood Site Traffic Analysis (2/1/77)
- Pace Associates Design Services Proposal For Calhoun Street Transit/Pedestrian Mall (5/21/82)
- Parking Survey 1950 (3/1/51)
- Perimeter Parkway (1/1/70)
- Preliminary & Final Design For The Calhoun Street Transit/Pedestrian Mall (5/19/82)
- Preliminary Roundabout Feasibility Analysis Broadway & Taylor Streets (11/19/2007)
- South Central Area & Downtown Connectivity Study Bicycle/Pedestrian Connections (2/18/2009)
- Southeast Industrial Corridor Plan (5/1/2002)
- Standard Construction Drawings Street Engineering Department (9/20/78)
- Urban Systems Program Design (3/1/76)
- Walk Fort Wayne Plan (1/1/2009)